Here our crew has used a combination of stick built and gang forms to achieve building design goals.
Non finished face, if there where exposed areas we could parge coat exposed areas to a Class A finish.
Curing and gaining straighten before our crew begins waterproofing.
We are authorized installer in both Mel and GCP systems, with applicable experience in other systems as required.
Lower level of 3/4 split cable cut, cap, grout, and patch was pending PT-Engineer stamped approval of stressing report.
Here we have the lower level of a 3/4 split with slab on grade post tension foundations connected to a conventional wall on a cantilevered footing allowing us to de brace at 75% compressive strength.
Upper level of 3/4 split cable cut, cap, grout, and patch was pending PT-Engineer stamped approval of stressing report.